
A student project brief
Choose a change that could reduce grid electricity use in a simple building scenario. Examples include shifting a flexible load to a sunnier period or comparing two operating schedules. Describe the target, the baseline, and the constraints before running a model.
Build the comparison
- Choose one outcome. Track grid electricity imported over a defined period or another quantity that fits the question.
- Hold the comparison steady. Use the same demand and weather assumptions for the baseline and proposed change.
- Explain the trade-off. Identify any cost, inconvenience, or operational constraint introduced by the proposal.
What to share
Present the scenario, a figure comparing the two cases, and a short explanation of why the result changes under those assumptions.